Managing BOM Changes After Release
ECO流程、影响评估和受控引入防止一处改动拖垮良率与一致性。
ECO process
Every change goes through review, not a quiet edit.
Impact check
Re-check solderability, test and documentation together.
Controlled intro
Phase changes to limit blast radius.
Key Takeaways
Key Takeaways
- Route every change through ECO.
- Recheck test and docs together.
- Phase the introduction.



