ISO 9001 · IATF 16949 Certified EMS Provider 0086 13045869871 david@komkia.com 中文EN

KOMKIA Insights

Managing BOM Changes After Release

Managing BOM Changes After Release

Managing BOM Changes After Release

ECO流程、影响评估和受控引入防止一处改动拖垮良率与一致性。

ECO process

Every change goes through review, not a quiet edit.

Impact check

Re-check solderability, test and documentation together.

Controlled intro

Phase changes to limit blast radius.

Key Takeaways

Key Takeaways

  • Route every change through ECO.
  • Recheck test and docs together.
  • Phase the introduction.
Back to Blog

Need a Manufacturing Partner You Can Trust?

Talk to David